Lead Planner Mechanical Job In Saudi Arabia

Planning Engineer

Job Id :1000532806


Description

Position Summary:
The Lead Planner Mechanical holds full accountability for the planning and scheduling, cost control, invoicing, preparation of daily, weekly & monthly reports attending the meetings internal & with client and doing the correspondences with client of mechanical construction scope on major industrial projects within the Kingdom. The role encompasses development and control of the mechanical baseline schedule, resource and manpower loading, progress measurement, earned value reporting, look-ahead planning and completion forecasting, across greenfield developments and brownfield works executed within operating facilities.
The position exists to provide Project Management with an accurate, substantiated and auditable assessment of mechanical schedule status, forward workload and completion outlook. The incumbent establishes the schedule that governs execution, quantifies the time impact of delay and disruption events, and furnishes the analytical basis for recovery and acceleration decisions. The role further directs the mechanical planning function, establishes planning standards and develops technical capability within the team.

Duties and Responsibilities:
1. Schedule Development and Baseline Control
• Develop the mechanical component of the Level 1, 2 and 3 project schedules with resources loading in Primavera P6 in accordance with the contract Work Breakdown Structure and approved activity coding structure.
• Establish the mechanical logic network encompassing equipment setting, piping fabrication and erection, welding, NDT, testing, pre-commissioning support and mechanical completion.
• Derive activity durations from quantity data and validated productivity norms, reconciled against the tender estimate and historical project performance.
• Resource-load and manpower-load the mechanical schedule; produce craft-wise histograms covering fitters, welders, riggers, millwrights, scaffolders and support labour.
• Conduct critical path and near-critical path analysis; identify float consumption, constraints and schedule exposure across the mechanical scope.
• Issue the mechanical baseline schedule for client review and approval, incorporate client comment, and maintain the approved baseline under formal revision control.
• Develop Level 4 and Level 5 detailed schedules for congested areas, tie-in windows, shutdown campaigns and critical equipment installation sequences.
• Maintain the schedule basis document covering assumptions, constraints, calendars, productivity rates and exclusions.

2. Progress Measurement and Performance Reporting
• Establish the mechanical progress measurement system, including rules of credit, activity weightages and quantity-based earned value methodology.
• Verify weekly physical progress against installed quantities and independently substantiate field returns prior to incorporation into the schedule.
• Update the Primavera P6 schedule on the approved data date; calculate planned, earned and actual progress and report variance against the baseline.
• Issue weekly and monthly progress reports incorporating S-curves, manpower histograms, performance indices (SPI, CPI), critical path status and completion forecast.
• Report equipment installation status, piping erection by diameter-inch, weld progress, NDT clearance and test pack completion against the approved plan.
• Develop and maintain the mechanical completion and system turnover schedule in alignment with the commissioning sequence and RFSU milestones.
• Present mechanical schedule status and performance analysis at internal project reviews and client progress meetings.

3. Look-Ahead Planning and Execution Support
• Issue rolling three-week and six-week look-ahead schedules; identify, assign and escalate constraints affecting the mechanical scope.
• Coordinate with Construction to confirm crew allocation, work-front availability, access provision and equipment readiness in advance of planned activities.
• Monitor engineering deliverable and material availability against the mechanical schedule; report late IFC drawings, isometrics, vendor data and bulk materials as schedule exposure.
• Interface with Procurement on equipment and material delivery status; incorporate confirmed and forecast dates into the schedule and quantify the impact of slippage.
• Plan brownfield activities around tie-in windows, shutdown durations, permit-to-work cycles, hot work restrictions and simultaneous operations.
• Support Construction in developing area-wise and system-wise execution sequences that protect the critical path.

4. Forecasting, Recovery and Change Control
• Forecast mechanical completion dates and remaining man-hour expenditure on a substantiated basis, independent of contractual milestone dates.
• Develop recovery and acceleration schedules in response to schedule slippage, with quantified resource and cost implications for management decision.
• Perform scenario and what-if analysis on sequence revision, resource augmentation, extended shift working and amended shutdown windows.
• Assess the schedule impact of variations, change orders and scope growth; prepare time impact analyses in support of Extension of Time submissions.
• Maintain contemporaneous records substantiating delay and disruption events attributable to the client or third parties.
• Provide schedule evidence and analytical support to the Commercial function for claims, counterclaims and prolongation cost assessment.

5. Interface Management and Project Controls Systems
• Coordinate mechanical planning with civil, structural, electrical, instrumentation, insulation and painting disciplines to establish realistic sequencing and interface dates.
• Review and validate subcontractor schedules and progress claims against the master schedule and approved measurement system.
• Reconcile planned man-hours against the award estimate and provide productivity feedback to the Estimation function at project close-out.
• Maintain schedule and progress data within the project controls environment (Primavera P6, ERP and reporting dashboards) with full auditability.
• Ensure schedule compliance with client planning specifications and reporting protocols, including Saudi Aramco schedule and progress requirements where applicable.

6. Leadership and Functional Development
• Direct and supervise the mechanical planning team; allocate workload and review all schedule updates and reports prior to issue.
• Mentor and develop junior planners, with emphasis on construction execution methodology and field sequencing.
• Establish and enforce planning standards, coding structures, templates, rules of credit and quality control procedures.
• Capture actual productivity and duration performance from executed work and maintain the corporate historical planning database.
• Contribute to project close-out reviews and to the continuous improvement of corporate planning procedures.

Preferred Candidate:
Qualification:
• Bachelor’s degree in mechanical engineering from a recognized universi

Basic Details

Location : Region: Abqaiq

Qualification :

Posted :

Job Type : Full-Time

Company : Saudi Jobs

Contact Info

Mobile : Not-Mentioned

Alternate Mobile : Not-Mentioned

Email : Gulammoheed22@gmail.com

By using our site, you acknowledge that you have read and understand our Cookie & Privacy Policy, and our User Agreement .